|
|
The liner is made up to the
specific length required and transported to the well site. The reel is set on
the rig floor and the liner uncoiled into the well. A special set of slips
will allow the liner to be hung off at the rig floor at any time, including when
the drill string will be attached to the running tool.
|
|
 |
|